Olympic Palace

The New Sports Palace opened in 2015 for the European Youth Olympic Festival. The main hall, with a capacity of between 3,600 and 4,000 spectators, is designed to host various sporting and cultural events. In 2022, a new arena was added for EuroBasket 2022, accommodating up to 10,000 spectators. To ensure a comfortable temperature for athletes and fans, a Midea chiller system with a capacity of 6,600 kW was installed in the facility.

customer:

Saba Construction LLC

Project type:

Stadium

Start date:

2022

solutions in project title

Hotel

In the realm of hotel climate management, meeting diverse needs is paramount. Hotels require solutions that not only provide simultaneous heating and cooling but also ensure fresh air circulation and reliable domestic hot water supply. Flexibility in design is essential to accommodate varying architectural layouts and guest preferences.

VIEW MORE